Conrem Energy Boiler Making in Benoni

 

Boiler making in Benoni has is and always will be a necessity in the world. Pressure vessels are an essential part of the storage of some of our most valuable resources, including almighty water.

 

Working in Benoni has been a great experience for the Conrem Energy team. As a result of the amazing response, we’ve had from our clients in the area, we would like to take a minute to talk more about boilers, boiler making and Conrem Energy’s Hot Water Cylinders.

 

Conrem Energy manufactures robust industrial water heating cylinders, up to 3,000 litres or multiples thereof. Thanks to the ongoing business we have in Benoni we now also offer a custom-built option whereby individual tanks can be designed and tailored to suit any application.

 

ALL cylinders going to Benoni are hot-dipped, galvanised and are pressure tested to 800kPa, with an operating pressure of up to 400kPa. Each has a standard 5 x 54 mm socket-outlet unless otherwise requested. Insulation of the cylinders is made from a 50mm vapour sealed, rigid solid foam.

 

Our Benoni customers should please note that these hot water cylinders can be used as storage vessels for primary heat sources e.g. solar water heating and heat-pumps, or they can be used with electrical heating elements only.

 

Conrem Energy offers the longest local guarantee on its industrial cylinders for Benoni.

 

Our cylinders are guaranteed for 5 years, from the date of installation/sale. This guarantee is subject to Conrem energy’s terms and conditions with pertinent items listed below.

 

  1. The water supplied to the cylinder must be of good quality i.e. not from an unfiltered borehole source. This is crucial, as poor-quality water can be aggressive towards the cylinder walls. Thermostat temperature setting must not exceed 55°C.
  2. Our thermostats are pre-set from our factory to 58°C and need a code to be changed. The temperature of the cylinder may not exceed 65°C.
  3. The maximum operating pressure must not exceed 400 kPa. A 400 kPa Temperature – Pressure safety valve is fitted onto each new unit. We highly recommend that the installer fits an adjustable Pressure reducing valve with a pressure gauge.

 

Normal lead time from date of order is 2 – 3 weeks for Benoni with delivery time-varying for national orders (*Terms & Conditions Apply). These cylinders can be delivered with or without lagging.

 

We would like to thank Benoni for your ongoing support, we look forward to doing even more business with you in the future. We aim to provide you with the best quality high presser vessels and hope that you will consider us for your next project.

 